Steel plate silo EPC general contracting technical measures
November 12, 2024
Steel Plate Warehouse EPC total contracting skills approach - anti-slabbing approach: because some projects have a high water table, in order to adhere to the warehouse monotonous environment.Between the concrete pad and the foundation set not less than 4mm thick SBS waterproof layer, the foundation concrete impermeability grade is not less than P6 level, and the library materials are in ±0.000 above.
Before feeding the library should be fully monotonous, to avoid the moisture contained in the library guide cone and fly ash contact, constituting fly ash slate.Specific methods are: to meet the time of natural ventilation monotonous, ventilation time is determined according to climatic conditions; if the natural ventilation can not meet the needs of the choice of mechanical forced ventilation monotonous; through the heating equipment for the library of the guide cone monotonous.
In the process of monotonous, through the detection instrument for testing, only after passing the test before adjusting into the material.Arch-breaking method: when the material is stored for a long time and cannot be discharged because of compaction, high-pressure air is used to break the arch through the arch-breaking fluidized rod to inflate the arch-breaking of the pressed material, which arrives at the intention of loosening the material and preventing the plate knot.
Self-circulation system: When the material is stored for a long time, the self-circulation system is used to transport the compacted material into the feeding port of the top of the warehouse through the force, and this self-circulation process can play a role in revitalizing the compressed material at the bottom of the warehouse and avoiding the intention of plate knot.The operation method and frequency are shown in the steel plate warehouse operation and utilization elucidation book.