1, the steel plate warehouse roof platform for overhaul, in order to prevent feeding holes, platform plate, rain ring leakage, the appearance of the components produce rust spots and so on, if there are rust spots should be dealt with in a timely manner.
2, the steel plate warehouse roof platform overhaul, in order to prevent feeding holes, platform plate, rain ring leakage, component appearance rust spots, etc., such as rust spots should be dealt with in a timely manner. Regularly on the whole welded steel plate warehouse roof, the steel plate warehouse roof weld inspection, according to the inspection to determine the necessary anti-corrosion treatment.
3, the cement warehouse process holes (including ventilation holes, manholes, temperature measurement holes, seat, etc.) to check the appearance of corrosion and leakage inspection.
4、Steel plate warehouse physical repair and maintenance regularly check whether the cement warehouse steel plate warehouse roof cover is intact, whether the fastening bolts are loose.
5, each time the steel plate warehouse full or empty, to check whether the steel plate warehouse wall deformation phenomenon, through the contour of the legs and other sensitive parts of the place to be particularly careful observation, and make a good inspection record for the archives. Annual inspection of the steel plate warehouse wall corrosion, according to the inspection of the steel plate warehouse wall anticorrosion treatment.
6, each time the cement warehouse empty steel plate warehouse, should be steel plate warehouse body inspection, steel plate warehouse door sealing is good, whether the steel plate warehouse door around the crack phenomenon, check the reinforcing bars and steel plate warehouse wall connection. If the cone bottom steel plate warehouse, should be cone bucket root parts of the inspection, according to the inspection of the cone bucket corrosion or other treatment.
7, annual anti-loosening check on the installation bolts of the straight ladder of the cement warehouse, and check whether the materials used are damaged, according to the inspection situation for anti-corrosion or other treatment.
8、When construction personnel enter the warehouse, they need to tie two safety ropes, one of which is fixed on the dust collector bracket outside the warehouse, and the other is fixed on top of the ladder inside the warehouse. Not to exceed the construction scope of construction, steel plate warehouse in the construction range installed temporary warning signs, prohibit unrelated personnel from entering the construction site. If you need to build shelves in the library and other high-altitude construction work should be strictly abide by the relevant provisions of the work at height.
9, into the steel plate warehouse construction personnel should wear good labor protection protective equipment, including windscreen, dust mask, labor insurance shoes, helmets and so on.
10、If there are special circumstances, special safety measures should be developed before construction.
11、Lighting fixtures in the warehouse are accessed from the hole of the material level meter in the middle of the warehouse roof, and the cleaning personnel shall not touch the lighting tools and lines.
12、When entering the cement steel plate warehouse to clean up, the ratio of the number of people outside the warehouse to the number of people inside the warehouse should be more than 2:1, and the outside should be assigned to monitor.
13, from the top of the library door to observe the library pile of materials and the library ladder solid situation and the top of the library, after confirming the safety, before entering.
14、Steel plate warehouse cleanup is completed, after acceptance and thorough cleaning of the construction site, the end of construction.